A worker takes 9 hours to complete a job on daily wages and 6 hours on scheme of payment by result.?

... his wage rate is ghc 1.50 an hour, the material cost of the product is ghc8 and the overhead is 150% of total direct wages. calculate the factory

... his wage rate is ghc 1.50 an hour, the material cost of the product is ghc8 and the overhead is 150% of total direct wages. calculate the factory cost of the product under following plans.
piece work plan
halsey plan
rowan plan

or:... his wage rate is ghc 1.50 an hour, the material cost of the product is ghc8 and the overhead is 150% of total direct wages. calculate the factory cost of the product under following plans.piece work planhalsey plan rowan plan

Tags: